I gave in to Trent’s idea and we began installing the new flooring last night:
About 3 hours later, we were finished and I had reinstalled most of the quarter round molding around the toilet area. Tonight we’re planning to finish installing the molding. Some of it snapped during demo so this will require another trip to the hardware store. And then I want to paint the recessed wall behind the toilet before we put it back – much easier than trying to work around it as I’ve done in our other two bathrooms.
Why is it that when doing home projects there is always without fail the "need another trip to the hardware store." LOL
BTW, I've been playing with your templates :)